2023-02-04 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active new Work Items of Type 'EN' For Current Status: From 'Creation of WI by WG/TB' Up to 'WI proposed to WG'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 3 Items...
Displaying items 1 to 3 ...
 
  IDENTIFICATION TITLE (Formal & Working) STATUS
1
New Work Item
Doc. Nb. EN 303 979
Ref. REN/SES-00467
Technical Body: SES
Directives: 2014/53/EU
Details and Download
Satellite Earth Stations and Systems (SES);
Harmonised Standard for Earth Stations on Mobile Platforms (ESOMP) transmitting towards satellites in non-geostationary orbit, operating in the 27,5 GHz to 29,1 GHz and 29,5 GHz to 30,0 GHz frequency bands
covering the essential requirements of article 3.2 of the Directive 2014/53/EU
NGSO ESOMP 27,5 GHz to 30,0 GHz
Drafting Stage
Current Status:
TB adoption of WI (2023-01-05)
Next Status:
EC informed of mandated WI
2
New Work Item
Doc. Nb. EN 302 574-2
Ref. REN/SES-00466
Technical Body: SES HARM
Directives: 2014/53/EU
Details and Download
Satellite Earth Stations and Systems (SES);
Harmonised Standard for Mobile Earth Stations (MES) operating in the 1 980 MHz to 2 010 MHz (earth-to-space) and 2 170 MHz to 2 200 MHz (space-to-earth) frequency bands covering the essential requirements of article 3.2 of the Directive 2014/53/EU;
Part 2: User Equipment (UE) for wideband systems
Rev EN302 574-2 Conventional CGC
Drafting Stage
Current Status:
TB adoption of WI (2023-01-05)
Next Status:
EC informed of mandated WI
3
New Work Item
Doc. Nb. EN 302 574-1
Ref. REN/SES-00465
Technical Body: SES HARM
Directives: 2014/53/EU
Details and Download
Satellite Earth Stations and Systems (SES);
Harmonised Standard for Mobile Earth Stations (MES) operating in the 1 980 MHz to 2 010 MHz (earth-to-space) and 2 170 MHz to 2 200 MHz (space-to-earth) frequency bands covering the essential requirements of article 3.2 of the Directive 2014/53/EU;
Part 1: Complementary Ground Component (CGC) for wideband systems
rev EN 302 574-1 Conventional CGC
Drafting Stage
Current Status:
TB adoption of WI (2023-01-05)
Next Status:
EC informed of mandated WI
  Found 3 Items...
Displaying items 1 to 3 ...
 
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...