|
26wglitd019
|
DOCUMENT
|
|
Title:
|
|
AP 85/2000 IRI message sequence for CFNR scenario
|
|
|
Document Name:
|
|
|
Source:
|
|
|
Content Type:
|
|
|
Allocation:
|
|
|
Specification:
|
|
|
CR category:
|
|
|
Release:
|
|
|
WI code:
|
|
|
Document for:
|
|
|
Abstract:
|
|
This TD has been created as the result of
AP 85/2000.
According to the ES 201 671 Section A.6.16.1
(Call Diversion by Target) in case of CFNR
scenario the two sets of IRI-(Begin/Continue/End)
messages are required. That stays in conflict to
the modification proposal of A.8.4 submitted
in the TD 020 during meeting in Brussels.
To avoid inconsistency between technology
specific annexes Lucent proposes the appropriate
modification of A.6.16.1 within ES 201 671.
|
|
|
FILE INFORMATION
|
|
Filename:
|
|
26wglitd019 CFNR-scenario.doc
|
File is Uploaded
|
|
|
File Path:
|
|
|
File Size:
|
|
|
Creation Date:
|
|
|
Last Modif. Date:
|
|