| | INT(22)053020 | Test description for IPv6-only servces over 5G | Available | ETSI | Other |
| | INT(22)000026 | Draft - DTS/INT-00195 v0.0.1 (TS 103 878-3 ) | Noted | ETSI | Draft |
| | INT(22)000025 | Draft - DTS/INT-00194 v0.0.1 (TS 103 878-2 ) | Noted | ETSI | Draft |
| | INT(22)053019 | Draft - DTS/INT-00193 v0.0.1 (TS 103 878-1 ) | Noted | ETSI | Draft |
| | INT(22)000024 | Introduction GAIA-X | Available | ETSI | Other |
| | INT(22)053018 | TC INT_AFI_TR 103 195-1_ETS_103_195-1 | Noted | Vodafone GmbH | Draft |
| | INT(22)053017 | TC INT_AFI_TR 103 195-1_ETS_103_195-1 | Withdrawn | IPv6 Forum,Vodafone GmbH | Draft |
| | INT(22)053016 | TR 103 629_ANA Trust and Confidence Building | Available | Vodafone GmbH | Draft |
| | INT(22)053015 | TR 103 628_GANA Implementation_Instantiations_Guide | Available | Vodafone GmbH | Draft |
| | INT(22)053012r1 | Draft - DTS/INT-00196 v (TS 103 905 ) "VoNR/ViNR and VoLTE/ViLTE interconnection testing for interworking and roaming scenarios with QoS/Q" | Available | Mesaqin.com s.r.o (Ltd.) | Draft |
| | INT(22)000021r1 | INT#53_Agenda_r1 | Available | ETSI | Agenda |
| | INT(22)053014 | Lack of Interoperability of VoLTE in North America | Available | ETSI | Other |
| | INT(22)000023 | STF AI proposal | Available | ETSI | Other |
| | INT(22)000022 | GSMA Presentation | Available | ETSI | Other |
| | INT(22)053013r2 | TS 103 833-3 CTS for the SCC-AS Services-ATS&PIXIT - TTCN-3 code | Available | TTF T016 | Other |
| | INT(22)053013r1 | TS 103 833-3 CTS for the SCC-AS Services-ATS&PIXIT - TTCN-3 code | Revised | TTF T016 | Other |
| | INT(22)053013 | TS 103 833-3 CTS for the SCC-AS Services-ATS&PIXIT - TTCN-3 code | Revised | TTF T016 | Other |
| | INT(22)053012 | Draft - DTS/INT-00196 v (TS 103 905 ) "VoNR/ViNR and VoLTE/ViLTE interconnection testing for interworking and roaming scenarios with QoS/Q" | Revised | Mesaqin.com s.r.o (Ltd.) | Draft |
| | INT(22)053011 | DTS 203; Closed User Group (CUG) using IP Multimedia (IM) Core Network (CN) subsystem at the AGCF connecting legacy access | Available | Mesaqin.com s.r.o (Ltd.) | Other |
| | INT(22)053010 | Closed User Group (CUG) using IP Multimedia (IM) Core Network (CN) subsystem at the AGCF connecting legacy access | Accepted | Mesaqin.com s.r.o (Ltd.) | NWI |
| | INT(22)053009 | TTF T016 final report milestone C | Accepted | TTF T016 | Other |
| | INT(22)053008 | TS 103 833-3 CTS for the SCC-AS Services-ATS&PIXIT | Accepted | TTF T016 | Draft |
| | INT(22)053007 | TS 103 833-2 CTS for the SCC-AS Services-TSS&TP | Accepted | TTF T016 | Draft |
| | INT(22)053006 | TS 103 833-1 CTS for the SCC-AS Services-PICS | Accepted | TTF T016 | Draft |
| | INT(22)053005 | Draft TS 103 795-2 TD for Network Interoperability emergency services over VoLTE | Available | Sintesio, Foundation | Other |
| | INT(22)053004 | Draft TS 103 795-1 TP for Network Interoperability emergency services over VoLTE | Available | Sintesio, Foundation | Other |
| | INT(22)053003 | TTFT010 Progress Report A | Accepted | Sintesio, Foundation | Other |
| | INT(22)000021 | INT#53_Draft Agenda | Revised | ETSI | Agenda |
| | INT(22)000020 | LS In From FG AN | Available | ETSI | LSin |
| | INT(22)053002 | LS IN from ISG IPE on on_NWI_Testing_and_Validation_of_IPv6_SRv6 | Available | ETSI | LSin |
| | INT(22)053001 | Liaison Statement from ISG IPE | Available | ETSI | LSin |
| | INT(22)000019 | Description of Test Requirements and Approach for E2E Federated Testbeds | Available | VODAFONE Group Plc | Draft |
| | INT(22)000018 | NWI 5G NAS Conformance Testing for the N1 interface; (3GPPTM Release 16); Part ": ATS & PiXit | Accepted | ETSI | NWI |
| | INT(22)000017 | NWI: 5G NAS Conformance Testing for the N1 interface; (3GPPTM Release 16); Part 2: TS&TP | Accepted | ETSI | NWI |
| | INT(22)000016 | NWI 5G NAS Conformance Testing for the N1 interface; (3GPPTM Release 16); Part 1: PICS | Accepted | ETSI | NWI |
| | INT(22)000015 | 5G NGAP Conformance Testing for the N2 interface; (3GPPTM Release 16); Part ": ATS&PiXit | Accepted | ETSI | NWI |
| | INT(22)000014 | NWI 5G NGAP Conformance Testing for the N2 interface; (3GPPTM Release 16); Part 2: TSS&TP | Accepted | ETSI | NWI |
| | INT(22)000013 | NWI 5G NGAP Conformance Testing for the N2 interface; Part 1: PICS | Accepted | ETSI | NWI |
| | INT(22)052010r1 | ToR 5G Conformance test specification over N1 and N2 reference points | Available | Sintesio, Foundation | Other |
| | INT(22)000012 | LS to ISG_IPE_on_5G_IPv6_only_Interop_Test_Description | Available | ETSI | LSout |
| | INT(22)052011 | Autonomic 5G Networks powered by ETSI GANA , AI, and IPv6 V002 | Noted | Vodafone GmbH | Draft |
| | INT(22)052010 | ToR 5G Conformance test specification over N1 and N2 reference points | Revised | Sintesio, Foundation | Other |
| | INT(22)052002r1 | Draft - DTS/INT-00163TS 101 597-3 v1.1.4 (TS 101 597-3 ) "TSS& TP for CUG using IP Multimedia (IM) at the AGCF connecting legacy access" | Accepted | Mesaqin.com s.r.o (Ltd.) | Draft |
| | INT(22)052004r1 | VoNR/ViNR and VoLTE/ViLTE interconnection testing for interworking and roaming scenarios with QoS/QoE | Available | Mesaqin.com s.r.o (Ltd.) | Other |
| | INT(22)052009 | Updated INT#52 Agenda with AFI | Available | VODAFONE Group Plc | Agenda |
| | INT(22)052008 | TS 103 833-3 CTS for the SCC-AS Services-ATS&PIXIT | Noted | TTF T016 | Draft |
| | INT(22)052007 | TS 103 833-2 CTS for the SCC-AS Services-TSS&TP | Noted | TTF T016 | Draft |
| | INT(22)052006 | TS 103 833-1 CTS for the SCC-AS Services-PICS | Noted | TTF T016 | Draft |
| | INT(22)052005 | TTF T016 Progress report B | Available | TTF016 | Other |
| | INT(22)052004 | VoNR/ViNR and VoLTE/ViLTE interconnection testing for interworking and roaming scenarios with QoS/QoE | Revised | Mesaqin.com s.r.o (Ltd.) | Other |