| | INT(19)044029 | Draft meeting report of TC INT#44 | Available | ETSI | Report |
| | INT(19)044028 | Draft White Paper on AI in Test Systems and Testing AI Models New Draft Version | Available | Orange | Other |
| | INT(19)044027 | Status of art of AI testing | Reserved | TELECOM ITALIA S.p.A. | NWI |
| | INT(19)044026 | GSMA report to TC INT#44 | Available | GSM Association | Other |
| | INT(19)044007r1 | Draft TS 103 653-1 TP&PICS for VoLTE/ViLTE interoperability | Noted | STF574 | Draft |
| | INT(19)044022r1 | Draft - RTS/INT-00161 v2.3.8 (TS 186 001-5 ) "Network Integration Testing between ISDN-ISDN and ISDN-PSTN over over SIP II NNI / SIP-I NNI" | Noted | Mesaqin.com s.r.o (Ltd.) | Draft |
| | INT(19)044023a1r1 | TS 183 036 review | Available | Mesaqin.com s.r.o (Ltd.) | Other |
| | INT(19)044025 | TR 103 626 final version | Available | Orange | Other |
| | INT(19)044005a1 | BOARD(19)124_016_Testing_Task_Force_Roadmap_2020.doc | Available | ETSI | Other |
| | INT(19)044024 | SIGOS 5G Smartphone Experience_5G Service Test Results_download. | Available | SIGOS GmbH | Other |
| | INT(19)044023a1 | TS 183 036 review | Revised | Mesaqin.com s.r.o (Ltd.) | Other |
| | INT(19)044023 | ISDN/SIP interworking; TS 183 036 | Accepted | Mesaqin.com s.r.o (Ltd.) | NWI |
| | INT(19)044022 | Draft - RTS/INT-00161 v2.3.8 (TS 186 001-5 ) "Network Integration Testing between ISDN-ISDN and ISDN-PSTN over over SIP II NNI / SIP-I NNI" | Revised | Mesaqin.com s.r.o (Ltd.) | Draft |
| | INT(19)000014 | Draft - RTS/INT-00161 v2.3.8 (TS 186 001-5 ) "Network Integration Testing between ISDN-ISDN and ISDN-PSTN over over SIP II NNI / SIP-I NNI" | Withdrawn | Mesaqin.com s.r.o (Ltd.) | Draft |
| | INT(19)044021 | editHelp Guidelines on Forge | Available | ETSI | Other |
| | INT(19)044020 | LS on the second edition of Series H Supplement 19 “Usage of video signal type code points” [to ARIB et al.] | Available | ITU-T | LSin |
| | INT(19)043003a1 | Comments to the LS during the RC period | Available | ETSI | Other |
| | INT(19)044019 | ETSI GANA Guide Book | Available | Orange | CR |
| | INT(19)044018 | Draft TS 103 571-3 v2.0.1 ATS&PIXIT - Diameter Conformance Testing for the Sh/Dh interfaces | Noted | STF579 | Draft |
| | INT(19)044017 | Draft TS 103 571-2 v2.0.1 TSS&TP - Diameter Conformance Testing for the Sh/Dh interfaces | Noted | STF579 | Draft |
| | INT(19)044016 | Draft TS 103 571-1 v2.0.1 PICS - Diameter Conformance Testing for the Sh/Dh interfaces | Noted | STF579 | Draft |
| | INT(19)044015 | STF579 Progress Report A | Accepted | STF579 | Other |
| | INT(19)000013 | LS on Invitation to update the information in the IMT2020 roadmap [to ITU study groups and external IMT-2020 liaison partners] | Available | ITU-T | LSin |
| | INT(19)044014 | LS on agreement of new Supplement 71 to ITU-T Q-series Recommendations “Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator’s | Available | ITU-T | LSin |
| | INT(19)044013 | Statement Regarding Engagement with Companies ETSI | Available | ETSI | Other |
| | INT(19)000012 | TC INT presentation to 3GPP and OCG | Reserved | ETSI | Other |
| | INT(19)044012 | ITU-T SG13 activities | Reserved | Orange | Other |
| | INT(19)044011 | Draft TS 103 653-3 ATS&PIXIT for VoLTE/ViLTE interoperability | Noted | STF574 | Draft |
| | INT(19)044010 | SliceNet project | Available | Orange | Other |
| | INT(19)044009 | Draft TS 103 653-2 TDs for VoLTE/ViLTE interoperability | Noted | STF574 | Draft |
| | INT(19)044008 | Report of GSMA activities | Reserved | GSM Association | Other |
| | INT(19)044007 | Draft TS 103 653-1 TP&PICS for VoLTE/ViLTE interoperability | Revised | STF574 | Draft |
| | INT(19)044006 | Report from last OCG (OCG#69 18 September 2019) | Available | ETSI | Other |
| | INT(19)044005 | Report from last BOARD (ETSI Board#124 - 24-26 September 2019) | Available | ETSI | Other |
| | INT(19)044004 | STF574 Progress Report B | Accepted | STF574 | Other |
| | INT(19)000011 | Draft - DTS/INT-00132 v0.0.26 (TS 103 427 ) "Framework for e2e internet related measurements for fixed and mobile networks" | Accepted | ETSI | Draft |
| | INT(19)044003 | LS to SG12 for Harmonization of IP Capacity and Latency Parameters: Revision of Draft Rec. Y.1540 on IP packet transfer performance parameters and New Annex A with Lab Evaluation Plan | Rejected | INT | LSout |
| | INT(19)044002 | Draft meeting report of TC INT#44 | Reserved | Secretary | Report |
| | INT(19)044001 | Draft agenda for TC INT#44 | Available | Chairman | Agenda |
| | INT(19)000010 | TTF - AI in Test Systems and Testing AI Models | Accepted | TELECOM ITALIA S.p.A. | Other |
| | INT(19)043026 | BBF liaison to ETSI - LIAISE-342-oLS to ETSI INT AFI WG in response to LIAISE-300-00 (1) | Available | ETSI | LSin |
| | INT(19)043025 | Autonomous networks - ETSI INT | Available | ETSI | Other |
| | INT(19)000009 | TTF_ToR_VoLTE ViLTE validation | Accepted | TELECOM ITALIA S.p.A. | Other |
| | INT(19)000008 | TTF_Conformance Test Specifications for the SCC-AS Services | Accepted | TELECOM ITALIA S.p.A. | Other |
| | INT(19)000007 | TTF_ToR_AI inTest Systems | Reserved | TELECOM ITALIA S.p.A. | Other |
| | INT(19)043024 | LS to ITU-T FG ML5G | Available | Secretary | LSout |
| | INT(19)043021r1 | ETSI_ITU_Mapping_January 2016_reviewed by TC INT | Available | ETSI | Other |
| | INT(19)043023r1 | Artificial Intelligence (AI) in Test Systems | Accepted | Orange | NWI |
| | INT(19)043023 | Artificial Intelligence (AI) in Test Systems | Revised | Orange | NWI |
| | INT(19)043007r2 | Draft - RTS/INT-00161 v2.3.6 (TS 186 001-5 ) "Network Integration Testing between ISDN-ISDN and ISDN-PSTN over over SIP II NNI / SIP-I NNI" | Noted | Mesaqin.com s.r.o (Ltd.) | Draft |