| | EE2(17)051028 | Draft - DTS/EE-0259-3 v0.0.2 "New energy storage technology - super-capacitor" | Noted | WG/TG Chairman | Draft |
| | EE2(17)051027 | Information liaison to ITU-T Q6/5 | Accepted | WG/TG Chairman | LSout |
| | EE2(17)051026 | Draft - DTS/EE-0267 v0.0.5 (TS 103 531 ) | Accepted | WG/TG Chairman | Draft |
| | EE2(17)051025 | Draft - RES/EE-0255 v2.2.6 (ES 200 283-1 ) "Assessment and test of transient voltages at 400V DC interface" | Available | Huawei Tech.(UK) Co., Ltd | Draft |
| | EE2(17)051024 | Draft - DTS/EE-0259-0 v0.0.7 "New energy storage technology overview" | Accepted | WG/TG Chairman | Draft |
| | EE2(17)051023 | Draft - DTS/EE-0267 v0.0.4 (TS 103 531 ) | Noted | WG/TG Chairman | Draft |
| | EE2(17)051022 | Draft - DTS/EE-0267 v0.0.3 (TS 103 531 ) | Noted | ETSI | Draft |
| | EE2(17)051021 | Draft - REN/EE-0264 v0.0.3 (EN 300 132-1 ) "AC power interface" | Noted | WG/TG Chairman | Draft |
| | EE2(17)051020r1 | Draft - REN/EE-0257 v2.1.11 (EN 302 099 ) "reverse powering handshake and 400V DC remote powering on power cable and power back-up" | Noted | WG/TG Chairman | Draft |
| | EE2(17)051020 | Draft - REN/EE-0257 v2.1.10 (EN 302 099 ) "reverse powering handshake and 400V DC remote powering on power cable and power back-up" | Revised | WG/TG Chairman | Draft |
| | EE2(17)051019 | Draft - RES/EE-0256 v2.2.5 (ES 200 283-2 ) "Assessment and test of transient voltages at -48V DC interface" | Available | WG/TG Chairman | Draft |
| | EE2(17)051018r1 | Draft - DES/EE-0252 v0.0.16 (ES 203 474 ) "Coupling renewable energy to 400VDC systems" | Available | WG/TG Chairman | Draft |
| | EE2(17)051018 | Draft - DES/EE-0252 v0.0.16 (ES 203 474 ) "Coupling renewable energy to 400VDC systems" | Revised | WG/TG Chairman | Draft |
| | EE2(17)051017 | Draft - DES/EE-0252 v0.0.15 (ES 203 474 ) "Coupling renewable energy to 400VDC systems" | Available | WG/TG Chairman | Draft |
| | EE2(17)051016 | Draft - DTS/EE-0267 v0.0.3 (TS 103 531 ) | Noted | WG/TG Chairman | Draft |
| | EE2(17)051015 | Draft - PWI_EE02_1625_v1 v (ES 202 336-12 ) "Monitoring and control interface for telecom/ICT equipment information model" | Noted | Orange | Draft |
| | EE2(17)051014r1 | joint edition e-meeting EE2 + ITU-T Q6 on wednesday 31th May 9-12 AM (Fr time) | Available | WG/TG Chairman | Agenda |
| | EE2(17)051014 | joint edition e-meeting EE2 + ITU-T Q6 on wednesday 31th May 9-12 AM (Fr time) | Revised | WG/TG Chairman | Agenda |
| | EE2(17)051013r1 | 3 joint NWI proposal to EE2 by ITU-T Q6 | Available | WG/TG Chairman | Other |
| | EE2(17)051013 | 3 joint NWI proposal to EE2 by ITU-T Q6 | Revised | WG/TG Chairman | Other |
| | EE2(17)051012 | Draft - DES/EE-0260 v0.0.5 "progressive migration of Telecom/ICT site to 400VDC" | Noted | WG/TG Chair | Draft |
| | EE2(17)051011 | Draft - REN/EE-0257 v2.1.9 (EN 302 099 ) "reverse powering handshake and 400V DC remote powering on power cable and power back-up" | Noted | ORANGE | Draft |
| | EE2(17)051010 | Draft - DTS/EE-0259-1 v0.0.6 "New energy storage technology - battery" | Noted | WG/TG Chairman | Draft |
| | EE2(17)051009 | Draft - DTS/EE-0259-0 v0.0.6 "New energy storage technology overview" | Noted | ORANGE | Draft |
| | EE2(17)051008r2 | Operated by either Direct current source up to 400 V or Alternating current source | Accepted | HUAWEI TECH. GmbH | NWI |
| | EE2(17)051008r1 | Operated by either Direct current source up to 400 V or Alternating current source | Revised | HUAWEI TECH. GmbH | NWI |
| | EE2(17)051008 | Operated by either Direct current source up to 400 V or Alternating current source | Revised | HUAWEI TECH. GmbH | NWI |
| | EE2(17)051007 | EE-0257v218 - comments from Huawei | Reserved | HUAWEI TECH. GmbH | CR |
| | EE2(17)051006 | Comments to EE-0260v002 (003) | Reserved | HUAWEI TECH. GmbH | Other |
| | EE2(17)051005 | Draft - DES/EE-0260 v0.0.3 "progressive migration of Telecom/ICT site to 400VDC" | Noted | WG/TG Chair | Draft |
| | EE2(17)051004 | Draft - DTS/EE-0259-1 v0.0.5 "New energy storage technology - battery" | Noted | WG/TG Chairman | Draft |
| | EE2(17)051003 | Draft - DTS/EE-0259-0 v0.0.5 "New energy storage technology overview" | Noted | WG/TG Chairman | Draft |
| | EE2(17)051002r1 | Draft - DTS/EE-0259-1 v0.0.4 "New energy storage technology - battery" | Withdrawn | WG/TG Chairman | Draft |
| | EE2(17)051002 | Draft - DTS/EE-0259-1 v0.0.4 "New energy storage technology - battery" | Withdrawn | WG/TG Chairman | Draft |
| | EE2(17)051001r2 | Meeting Agenda | Available | Chairman | Agenda |
| | EE2(17)051001r1 | Meeting Agenda | Revised | Chairman | Agenda |
| | EE2(17)051001 | Meeting Agenda | Revised | Chairman | Agenda |
| | EE2(17)000007 | Sustainable power feeding solutions for 5G network | Accepted | WG/TG Chairman | NWI |
| | EE2(17)000006 | Draft - REN/EE-0264 v0.0.2 (EN 300 132-1 ) "AC power interface" | Noted | ETSI | Draft |