| | NTECH(17)19_017 | Draft - NTECH-00037v005 (TR 103 453) | Accepted | NTT corporation | Draft |
| | NTECH(17)19_016 | Transfer of NTECH AFI activities to TC INT | Accepted | Chairman | LSout |
| | NTECH(17)19_015r1 | New WI for evaluation of the GANA for autonomic and intelligent control of heterogeneous wireless networks (WISHFUL Approach) | Accepted | WG/TG Chairman | NWI |
| | NTECH(17)19_015 | New WI for evaluation of the GANA for autonomic and intelligent control of heterogeneous wireless networks (WISHFUL Approach) | Revised | ORANGE | NWI |
| | NTECH(17)19_014r1 | Draft ETSI TR 103 473 V0.2.1 (2017-10) | Available | Incelligent | Other |
| | NTECH(17)19_014 | Draft ETSI TR 103 473 V0.2.1 (2017-10) | Revised | Incelligent | Other |
| | NTECH(17)19_013 | Joint Position/Proposal regarding where AFI WG should be moved when TC NTECH terminates its existence | Available | Vodafone GmbH | Other |
| | NTECH(17)19_012r2 | STF 501 Ph2 Progress report M3 | Available | Incelligent | Report |
| | NTECH(17)19_012r1 | STF 501 Ph2 Progress report M3 | Revised | Incelligent | Report |
| | NTECH(17)19_012 | STF 501 Ph2 Progress report M3 | Revised | Incelligent | Report |
| | NTECH(17)19_011 | Frequent Editorial Mistakes | Available | Chairman | Other |
| | NTECH(17)19_010 | Draft - NTECH-00037v004 (TR 103 453) | Available | Rapporteur | Other |
| | NTECH(17)19_009r1 | Draft ETSI TR 103 473 V0.1.1 (2017-10) | Withdrawn | Incelligent | Draft |
| | NTECH(17)19_009 | Draft ETSI TR 103 473 V0.1.1 (2017-10) | Withdrawn | Incelligent | Draft |
| | NTECH(17)19_008 | Proposal of new WI to revise ETSI TR 103 282 V1.1.1 | Available | NTT corporation | Other |
| | NTECH(17)19_007r1 | TC NTECH 2018 planning | Available | Chairman | Other |
| | NTECH(17)19_007 | TC NTECH 2018 planning | Revised | Chairman | Other |
| | NTECH(17)19_006 | NNAR and Project M493 activities presented at ECC WG NaN 14th meeting (May 2017) | Available | TELECOM ITALIA S.p.A. | Other |
| | NTECH(17)19_005 | LS from ISG NFV on Instantiation of the GANA model on the Broadband Forum architecture | Available | ETSI Secretariat | LSin |
| | NTECH(17)19_004 | LS from BBF acknowledging receiption of the liaison NTECH(17)18_021 | Available | ETSI Secretariat | LSin |
| | NTECH(17)19_003 | NTECH#19 meeting report | Accepted | Chairman | Report |
| | NTECH(17)19_002r2 | NTECH#19 meeting agenda | Available | Chairman | Agenda |
| | NTECH(17)19_002r1 | NTECH#19 meeting agenda | Revised | Chairman | Agenda |
| | NTECH(17)19_002 | NTECH#19 meeting agenda | Revised | Chairman | Agenda |
| | NTECH(17)19_001 | Draft - RES/NTECH-00036 v3.2.1 (ES 283 035 ) "e2 intf - DIAMETER based - Release 3" | Accepted | ORANGE | Draft |
| | NTECH(17)18bis005 | NTECH AFI answer to LS from ISG ENI to NTECH AFI on the start of ISG ENI | Accepted | WG/TG Chairman | LSout |
| | NTECH(17)18bis002 | NTECH#18bis meeting report | Accepted | Chairman | Report |
| | NTECH(17)18_024r1 | LS to 3GPP SA2 and 3GPP SA5 | Accepted | ORANGE | LSout |
| | NTECHAFI(17)19_008 | Information on Approaches that could be pursued in gaining EC Support on Testbeds as Open Networking Platform for Standards Validation | Available | IPv6 Forum | Other |
| | NTECHAFI(17)19_007 | AFI REport # 19 | Available | ORANGE | Other |
| | NTECHAFI(17)19_006 | TS103 195 | Available | ORANGE | Other |
| | NTECHAFI(17)19_005 | BBF-NTECH AFI press release | Available | ORANGE | Other |
| | NTECHAFI(17)19_004r1 | New WI name: Instantiating of the GANA Model onto the European Commission (EC) funded WISHFUL Project | Available | ORANGE | Other |
| | NTECHAFI(17)19_004 | New WI name: Instantiating of the GANA Model onto the European Commission (EC) funded WISHFUL Project | Revised | ORANGE | Other |
| | NTECHAFI(17)19_003 | ETSI TS 103 195-2 (V0.1.1) 2017-09 | Available | ORANGE | Other |
| | NTECHAFI(17)19_002 | New WI name: Instantiating of the GANA Model onto the European Commission (EC) funded WISHFUL Project | Withdrawn | ORANGE | Other |
| | NTECHAFI(17)19_001 | ETSI TS 103 195-2 (V0.1.1) 2017-09 | Withdrawn | ORANGE | Other |