Quick access
 
Contributions for ATTM AT2
  (View query details here)    Show filter options
  
Refresh Export to...
Default View
To apply filters, please click on Refresh
Drag a column header and drop it here to group by that column
Data pager
Data pager
1
Items per page
PageSizeComboBox
select
Page 1 of 1, rows 1 to 31 of 31
 UidTitleStatusSourceType
  
select
select
Data pager
Data pager
1
Items per page
PageSizeComboBox
select
Page 1 of 1, rows 1 to 31 of 31
 ATTMAT2(24)082010ODN Quick Construction and Digitalization Part1:General and GuidanceAvailableHuawei Technologies FranceDraft
 ATTMAT2(24)082009Draft of the presentation at 4th Joint FTTR workshop from ATTMAvailableHuawei Tech.(UK) Co.. LtdOther
 ATTMAT2(24)082008r1Deployment of indoor cabling system based on invisible optic cablesAvailableHuawei Technologies FranceOther
 ATTMAT2(24)082008Deployment of indoor cabling system based on invisible optic cablesRevisedHuawei Technologies FranceOther
 ATTMAT2(24)082007Deployment of Indoor Fibre Distribution Network Hybrid Cabling SystemAvailableHuawei Technologies FranceDraft
 ATTMAT2(24)082006ODN Quick Construction and Digitalization Part1:General and GuidanceAvailableHuawei Technologies FranceDraft
 ATTMAT2(24)082005ETSI TC ATTM WG AT2 Vice Chair Application Form from Xuming WuAvailableETSI SecretariatOther
 ATTMAT2(24)082004ETSI TC ATTM WG TM4 Vice chair Application FormWithdrawnETSI SecretariatOther
 ATTMAT2(24)082003Call for Candidates for ATTM AT2 WG Vice Chair positionAvailableETSI SecretariatOther
 ATTMAT2(24)082002Meeting report ATTM AT2#82ReservedWG/TG ChairReport
 ATTMAT2(24)082001r1Draft agenda ATTM AT2#82AvailableWG/TG ChairAgenda
 ATTMAT2(24)082001Draft agenda ATTM AT2#82RevisedWG/TG ChairAgenda
 ATTMAT2(24)081007Draft - PWI_ATTMAT2_2401_v1 vAvailableHuawei Technologies FranceDraft
 ATTMAT2(24)081006ATTM-0255v003_FTTR document_HSP_Response.with GillesGenin commentsAvailableOrangeOther
 ATTMAT2(24)081005Deployment of Indoor Fibre Distribution Network Hybrid Cabling SystemAvailableOrangeOther
 ATTMAT2(24)081004TS 104 021 ODN Quick Construction and Digitalization Part1:General and GuidanceAvailableOrangeOther
 ATTMAT2(24)081003Draft - DTS/ATTM-0255 v0.0.5 (TS 103 933 )NotedETSI SecretariatDraft
 ATTMAT2(24)081002r1AT2#81 meeting reportAvailableWG/TG ChairReport
 ATTMAT2(24)081002AT2#81 meeting reportRevisedWG/TG ChairReport
 ATTMAT2(24)081001r1AT2#81 meeting agendaAvailableWG/TG ChairAgenda
 ATTMAT2(24)081001AT2#81 meeting agendaRevisedWG/TG ChairAgenda
 ATTMAT2(24)080007Final draft of TS 103 933 - DTS/ATTM-0255 with responseNotedHuawei Tech.(UK) Co.. LtdDraft
 ATTMAT2(24)080006ODN Quick Construction and Digitalization Part1:General and GuidanceAvailableHuawei Technologies FranceDraft
 ATTMAT2(24)080005Propose AT2 to participate the fourth Joint Workshop on "FTTR" (Fibre to the room)AvailableHuawei Technologies FranceOther
 ATTMAT2(24)080004Deployment of Indoor Fibre Distribution Network Hybrid Cabling SystemAvailableHuawei Technologies FranceOther
 ATTMAT2(24)080003Deployment of Indoor Fibre Distribution Network Hybrid Cabling SystemAvailableHuawei Technologies FranceNWI
 ATTMAT2(24)080002AT2#80 meeting reportAvailableWG/TG Vice ChairReport
 ATTMAT2(24)080001r1AT2#80 meeting agendaAvailableWG/TG Vice ChairAgenda
 ATTMAT2(24)080001AT2#80 meeting agendaRevisedWG/TG Vice ChairAgenda
 ATTMAT2(24)000002ATTM AT2 presentation on Fiber Infra 4th ITU ETSI Joint FTTR workshopAvailableOrangeOther
 ATTMAT2(24)000001Draft - DTS/ATTM-0257 v0.0.2 (TS 104 021 )ReservedOrangeDraft