Full view
View    
select
 1   2  
92 contributions found, displaying 1 to 50
UID Type Title Status For MTG  
       F5G
F5G(26)000020 Agenda
Draft Agenda F5G-CC#195
Reserved Decision F5G-CC#195
F5G(26)000019 Report
Draft Report F5G-CC#194
Reserved Decision F5G-CC#195
F5G(26)000018 Agenda
Draft Agenda F5G-CC#194
Reserved Decision F5G-CC#194
F5G(26)000017 Report
Draft Report F5G-CC#193
Reserved Decision F5G-CC#194
F5G(26)000016 Agenda
Draft Agenda F5G-CC#193
Reserved Decision F5G-CC#193
F5G(26)000015 Report
Draft Report F5G-CC#192
Reserved Decision F5G-CC#193
F5G(26)000014 Agenda
Draft Agenda F5G-CC#192
Reserved Decision F5G-CC#192
F5G(26)000013 Report
Draft Report F5G-CC#191
Reserved Decision F5G-CC#192
F5G(26)000012 Agenda
Draft Agenda F5G-CC#191
Reserved Decision F5G-CC#191
F5G(26)000011 Report
Draft Report F5G-CC#190
Reserved Decision F5G-CC#191
F5G(26)000010 Agenda
Draft Agenda F5G-CC#190
Reserved Decision F5G-CC#190
F5G(26)025045r1 LSout
LSout to TC ATTM to transfer of activities from ISG F5G to TC
Accepted Decision F5G-F2F#25
F5G(26)025045 LSout
LSout to TC ATTM to transfer of activities from ISG F5G to TC
Revised Decision F5G-F2F#25
F5G(26)025042r1 Other
Proposed initial skeleton draft for “Specification for Ultra-Reliable Wavelength-Switched Optical Network (WSON)”
Accepted Decision F5G-F2F#25
F5G(26)025038r1 Draft
Final Draft - DGS/F5G-0033 v0.0.9 "F5G-A Requirements and Gap Analyses; Release 4"
Available Decision F5G-F2F#25
F5G(26)025021r2 Other
Proposed Architecture Overview text for F5G-0037 Chapter 5.1
Accepted Decision F5G-F2F#25
F5G(26)025044 Draft
Draft - DGR/F5G-0043 v0.0.2 "Green F5G-A"
Noted Information F5G-F2F#25
F5G(26)025041r1 Other
WI-33 review of reference
Accepted Decision F5G-F2F#25
F5G(26)025023r1 Other
Meeting:Plan
Noted Discussion F5G-F2F#25
F5G(26)025043 Other
List of F5G-A PoC Version 0.0.4
Accepted Decision F5G-F2F#25
F5G(26)025021r1 Other
Proposed Architecture Overview text for F5G-0037 Chapter 5.1
Revised Decision F5G-F2F#25
F5G(26)025029r1 Other
WI-042_Chapter6-FunchReqs_timesync_singleframe_mburst
Accepted Decision F5G-F2F#25
F5G(26)025030r1 Other
WI-042_Chapter6_HybridDeploymentFn_POM_mngm_related_fnc
Accepted Decision F5G-F2F#25
F5G(26)025031r1 Other
WI-042_Chapter6_UpstreamReg_WindowOptimization_TSN
Accepted Decision F5G-F2F#25
F5G(26)025032r1 Other
WI-042_Chapter7_NumberofTCONTs_TimeSync_Delay_protectionswitch
Accepted Decision F5G-F2F#25
F5G(26)025011r1 Other
Green F5G-A WI: Section 4 on Existing Sustainability Standards and Practices
Accepted Decision F5G-F2F#25
F5G(26)025042 Other
Proposed initial skeleton draft for “Specification for Ultra-Reliable Wavelength-Switched Optical Network (WSON)”
Revised Decision F5G-F2F#25
F5G(26)025014r1 Other
Contribution to ITU-T SG15 a summary on use cases requiring network characteristics
Accepted Decision F5G-F2F#25
F5G(26)025041 Other
WI-33 review of reference
Revised Decision F5G-F2F#25
F5G(26)025020r1 Other
Proposed NETCONF-based operations in Industrial PON in Chapter 4
Accepted Decision F5G-F2F#25
F5G(26)025017r1 Other
Proposed PON Infrastructure details in Chapter 5
Accepted Decision F5G-F2F#25
F5G(26)025015r1 Other
Merge request '!2' proposes to merge branch tangjjia-main-patch-2fdd into branch main
Accepted Decision F5G-F2F#25
F5G(26)025040 Draft
Final Draft - DGS/F5G-0036 v0.0.6 "F5G-A Arch Rel4"
Available Decision F5G-F2F#25
F5G(26)025034r1 Other
F5G outreach activities (Feb. 2026)
Noted Information F5G-F2F#25
F5G(26)025024r1 Other
F5G Roadmap
Noted Discussion F5G-F2F#25
F5G(26)025037r1 Report
Draft Report F5G-CC#189
Accepted Decision F5G-F2F#25
F5G(26)025002r1 Other
Draft Agenda with related contributions F5G#25
Noted Information F5G-F2F#25
F5G(26)025039 Other
ETSI DG decision about ISG F5G extension and the next steps
Noted Information F5G-F2F#25
F5G(26)025035r1 Other
WI-36 Review of F5G-A Arch R4
Accepted Decision F5G-F2F#25
F5G(26)025001r1 Agenda
F5G-F2F#25 meeting agenda
Accepted Decision F5G-F2F#25
F5G(26)025028r1 Other
PoC Proposal: LLM-based AI Assistant for F5G Network Fabric
Accepted Decision F5G-F2F#25
F5G(26)025027r1 Other
PoC Proposal: Distributed Intelligence with Privacy-Preserving Features for Fiber-To-The-Room
Accepted Decision F5G-F2F#25
F5G(26)025038 Draft
Final Draft - DGS/F5G-0033 v0.0.8 "F5G-A Requirements and Gap Analyses; Release 4"
Revised Decision F5G-F2F#25
F5G(26)025037 Report
Draft Report F5G-CC#189
Revised Decision F5G-F2F#25
F5G(26)025036 Draft
Draft - DGR/F5G-0043 v0.0.1 "Green F5G-A"
Noted Discussion F5G-F2F#25
F5G(26)025035 Other
WI-36 Review of F5G-A Arch R4
Revised Decision F5G-F2F#25
F5G(26)025034 Other
F5G outreach activities (Feb. 2026)
Revised Information F5G-F2F#25
F5G(26)025033 Other
F5G update (Feb. 2026)
Noted Information F5G-F2F#25
F5G(26)025032 Other
WI-042_Chapter7_NumberofTCONTs_TimeSync_Delay_protectionswitch
Revised Decision F5G-F2F#25
F5G(26)025031 Other
WI-042_Chapter6_UpstreamReg_WindowOptimization_TSN
Revised Decision F5G-F2F#25
 1   2