Full view
View    
select
 1   2  
90 contributions found, displaying 1 to 50
UID Type Title Status For MTG  
       EE
EE(19)056038 Other
Decision list of EE#56 meeting
Available Information EE#56
EE(19)000007r1 LSout
Status of activities related to energy efficiency standard for NFV
Available Decision EE#56
EE(19)056037 LSout
WI approved at EE Florence meeting proposed to ITU-T for consideration to become a joint deliverable
Available Decision EE#56
EE(19)056035r2 Draft
Final draft for DTS/EE-0259-3 (TS 103 553-3) Innovative energy storage technology - super-capacitor (TA-ITU:L.1222)
Accepted Decision EE#56
EE(19)056007r1 Report
EEPS reports to EE
Available Discussion EE#56
EE(19)056006r2 Report
EE2 report to EE
Available Discussion EE#56
EE(19)056036 Other
INFORMATION AND REQUEST FROM ISO/IEC JTC1 SC39: Sustainability – IT & Data Centres
Available Information EE#56
EE(19)056035r1 Draft
Final draft for DTS/EE-0259-3 (TS 103 553-3) Innovative energy storage technology - super-capacitor (TA-ITU:L.1222)
Revised Decision EE#56
EE(19)056035 Draft
Final draft for DTS/EE-0259-3 (TS 103 553-3) Innovative energy storage technology - super-capacitor (TA-ITU:L.1222)
Revised Decision EE#56
EE(19)056034 Draft
final draft of DES/EE-0269 (ES 203 700) 5Gpowering (TA-ITU:L.5G powering)
Accepted Decision EE#56
EE(19)056006r1 Report
EE2 report to EE
Revised Discussion EE#56
EE(19)056005r1 Report
EE1 report to EE
Available Discussion EE#56
EE(19)056032r1 NWI
Revision of EN 303423 to resolve EU Commission comments
Accepted Decision EE#56
EE(19)056001r3 Agenda
Draft Agenda of EE meeting;
Available Decision EE#56
EE(19)056001r2 Agenda
Draft Agenda of EE meeting;
Revised Decision EE#56
EE(19)056019r2 Other
Revision of EN 303423 to resolve EU Commission comments
Available Discussion EE#56
EE(19)056033 LSout
Reply on Energy Efficiency for 5G
Available Decision EE#56
EE(19)056032 NWI
Revision of EN 303423 to resolve EU Commission comments
Revised Decision EE#56
EE(19)000007 LSout
Status of activities related to energy efficiency standard for NFV
Revised Decision EE#56
EE(19)056031 NWI
Assessment of material efficiency of ICT network infrastructure goods (circular economy) part 5
Accepted Decision EE#56
EE(19)056030 NWI
Assessment of material efficiency of ICT network infrastructure goods (circular economy) part 4
Accepted Decision EE#56
EE(19)056029 NWI
Assessment of material efficiency of ICT network infrastructure goods (circular economy) part 3
Accepted Decision EE#56
EE(19)056028 NWI
Assessment of material efficiency of ICT network infrastructure goods (circular economy) part2
Accepted Decision EE#56
EE(19)056027 NWI
Assessment of material efficiency of ICT network infrastructure goods (circular economy) part1 general
Accepted Decision EE#56
EE(19)056019r1 Other
Revision of EN 303423 to resolve EU Commission comments
Revised Discussion EE#56
EE(19)056026 NWI
Green Abstraction Layer 3: GAL interface enhanced for the effective dynamic control
Accepted Decision EE#56
EE(19)056025 Draft
Final draft for DTS/EE-0259-3 (TS 103 553-3) Innovative energy storage technology - super-capacitor (TA-ITU:L.1222)
Noted Decision EE#56
EE(19)056024 NWI
Energy efficiency of server based on GPU
Accepted Decision EE#56
EE(19)056023 NWI
Update of EN303470
Accepted Decision EE#56
EE(19)056022 LSin
ITU-T SG5 WP2 active Work item
Available Discussion EE#56
EE(19)056021 Draft
Draft - REN/EE-017006 v2.1.6 (EN 300 019-2-8 ) "Stationary use at underground locations"
Accepted Decision EE#56
EE(19)056004r2 Other
Meeting timetable and GTM details
Available Information EE#56
EE(19)056004r1 Other
Meeting timetable
Revised Information EE#56
EE(19)056001r1 Agenda
Draft Agenda of EE meeting;
Revised Decision EE#56
EE(19)056020 Other
Draft minutes 4th meeting ACC-CG (24 September 2019)
Available Information EE#56
EE(19)056019 Other
Revision of EN 303423 to resolve EU Commission comments
Revised Discussion EE#56
EE(19)056018 Other
Comments of EU Commission officer on EN 303 423
Available Information EE#56
EE(19)056017 LSin
Liaison Statement (LS) from TC RRS related to the EC Expert Group on Reconfigurable Radio Systems (EG RRS) and RED (EG RED)
Available Discussion EE#56
EE(19)056016 LSout
Liaison_to_ETNO_ETF_ETNO_SD_WG_on_ETSI_EE_Energy_Efficiency_for_5G
Available Information EE#56
EE(19)056015 Other
ETSI TC-EE comments on the draft standardisation request on the Ecodesign of servers and data storage products
Available Information EE#56
EE(19)056014 Draft
Draft - DES/EE-EEPS22 v0.0.7 (ES 203 682 ) "Green Abstraction Layer 2: GAL interface enhanced for the effective dynamic control (TA-ITU:L.GAL2)"
Accepted Decision EE#56
EE(19)000006 LSout
Liaison statement to ITU-T SG5 on new draft Recommendation ITU-T L.EE_frame “Energy efficiency framework”
Accepted Decision
EE(19)056013 LSin
LS reply on energy efficiency from 3GPP SA5 to ITU-T SG5; cc TC EE
Available Discussion EE#56
EE(19)056012 LSin
Liaison statement from ITU-T SG5 on new draft Recommendation ITU-T L.EE_frame “Energy efficiency framework”
Available Discussion EE#56
EE(19)056011 Other
Technically equivalent deliverables in ETSI TC EE and ITU-T SG5
Available Discussion EE#56
EE(19)056010 Other
Information from ETSI BOARD
Available Information EE#56
EE(19)056009 Other
Information from OCG
Available Information EE#56
EE(19)056008 Report
M-ICT reports to EE
Reserved Discussion EE#56
EE(19)056007 Report
EEPS reports to EE
Revised Discussion EE#56
EE(19)056006 Report
EE2 report to EE
Revised Discussion EE#56
 1   2