searching Work items...
Work item number  VersionCurrent statusNext statusRapporteur name
RTS/TSGC-0329007vg00 (TS 129 007)
General requirements on interworking between the Public Land Mobile Network (PLMN) and the Integrate
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329079vg00 (TS 129 079)
Optimal media routeing within the IP Multimedia Subsystem (IMS); Stage 3
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329153vg00 (TS 129 153)
Service capability exposure functionality over Ns reference point
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationYan Yali
RTS/TSGC-0329154vg00 (TS 129 154)
Service capability exposure functionality over Nt reference point
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationYan Yali
RTS/TSGC-0329155vg00 (TS 129 155)
Traffic steering control; Representational State Transfer (REST) over St reference point
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationHuang Zhenning
RTS/TSGC-0329162vg00 (TS 129 162)
Interworking between the IM CN subsystem and IP networks
New Work Item 16.0.0TB approval (2019-06-04)Draft receipt by ETSI SecretariatBiondic Nevenka
RTS/TSGC-0329163vg40 (TS 129 163)
Interworking between the IP Multimedia (IM) Core Network (CN) subsystem and Circuit Switched (CS) ne
New Work Item 16.4.0TB approval (2019-12-10)Draft receipt by ETSI SecretariatBelling Thomas
RTS/TSGC-0329164vg00 (TS 129 164)
Interworking between the 3GPP CS domain with BICC or ISUP as signalling protocol and external SIP-I
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329201vg00 (TS 129 201)
Representational State Transfer (REST) reference point between Application Function (AF) and Protoco
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBrinkmann Horst
RTS/TSGC-0329212vg30 (TS 129 212)
Policy and Charging Control (PCC); Reference points
New Work Item 16.3.0TB approval (2020-03-18)Draft receipt by ETSI SecretariatBelling Thomas
RTS/TSGC-0329215vg00 (TS 129 215)
Policy and Charging Control (PCC) over S9 reference point; Stage 3
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationFernandez Susana
RTS/TSGC-0329217vg00 (TS 129 217)
Policy and Charging Control (PCC); Congestion reporting over Np reference point
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationZhou Xiaoyun
RTS/TSGC-0329219vg00 (TS 129 219)
Policy and charging control: Spending limit reporting over Sy reference point
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationZhou Xiaoyun
RTS/TSGC-0329235vg00 (TS 129 235)
Interworking between SIP-I based circuit-switched core network and other networks
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329250vg20 (TS 129 250)
Nu reference point between SCEF and PFDF for sponsored data connectivity
New Work Item 16.2.0TB approval (2019-12-10)Draft receipt by ETSI SecretariatZhou Xiaoyun
RTS/TSGC-0329251vg20 (TS 129 251)
Gw and Gwn reference point for sponsored data connectivity
New Work Item 16.2.0TB approval (2019-09-17)Draft receipt by ETSI SecretariatZhou Xiaoyun
RTS/TSGC-0329292vg00 (TS 129 292)
Interworking between the IP Multimedia (IM) Core Network (CN) subsystem (IMS) and MSC Server for IMS
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBiondic Nevenka
RTS/TSGC-0329311vg00 (TS 129 311)
Service Level Interworking (SLI) for messaging services
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationYan Yali
RTS/TSGC-0329368vg00 (TS 129 368)
Tsp interface protocol between the MTC Interworking Function (MTC-IWF) and Service Capability Server
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationXu Wenliang
RTS/TSGC-0329414vg00 (TS 129 414)
Core network Nb data transport and transport signalling
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329415vg00 (TS 129 415)
Core network Nb interface user plane protocols
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329468vg00 (TS 129 468)
Group Communication System Enablers for LTE (GCSE_LTE); MB2 reference point; Stage 3
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationBelling Thomas
RTS/TSGC-0329658vg00 (TS 129 658)
SIP Transfer of IP Multimedia Service Tariff Information; Protocol specification
New Work Item 16.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2020-07-15)PublicationKreipl Michael
RTR/TSGC-0329909vg00 (TR 129 909)
Diameter-based protocols usage and recommendations in 3GPP
New Work Item 16.0.0Status has changed within the last 45 days TB approval (2020-07-03)Draft receipt by ETSI SecretariatQiao Weihua
RTR/TSGC-0329949vg00 (TR 129 949)
Study on technical aspects on roaming end-to-end scenarios with Voice over LTE (VoLTE) IP Multimedia
New Work Item 16.0.0Status has changed within the last 45 days TB approval (2020-07-03)Draft receipt by ETSI SecretariatJesske Roland
RTS/TSGC-0343010vg00 (TS 143 010)
GSM Public Land Mobile Network (PLMN) connection types
New Work Item 16.0.0Status has changed within the last 45 days TB approval (2020-07-03)Draft receipt by ETSI SecretariatBiondic Nevenka
RTS/TSGC-0343045vg00 (TS 143 045)
Technical realization of facsimile group 3 transparent
New Work Item 16.0.0Status has changed within the last 45 days TB approval (2020-07-03)Draft receipt by ETSI SecretariatBiondic Nevenka
RTS/TSGC-0344021vg00 (TS 144 021)
Rate adaption on the Mobile Station - Base Station System (MS - BSS) interface
New Work Item 16.0.0Status has changed within the last 45 days TB approval (2020-07-03)Draft receipt by ETSI SecretariatBelling Thomas
RTS/TSGC-0348020vg00 (TS 148 020)
Rate adaption on the Base Station System - Mobile-services Switching Centre (BSS - MSC) interface
New Work Item 16.0.0Status has changed within the last 45 days TB approval (2020-07-03)Draft receipt by ETSI SecretariatBelling Thomas
Other WI reports Previous Next Full Search