searching Work items...
Work item number  VersionCurrent statusNext statusRapporteur name
RTS/TSGR-0438161vh40 (TS 138 161)
NR; User Equipment (UE) TRP (Total Radiated Power) and TRS (Total Radiated Sensitivity) requirement
New Work Item 17.4.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationWang Ruixin
RTS/TSGR-0438161vi10 (TS 138 161)
NR; User Equipment (UE) TRP (Total Radiated Power) and TRS (Total Radiated Sensitivity) requirement
New Work Item 18.1.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationWang Ruixin
RTS/TSGR-0438174vgb0 (TS 138 174)
NR; Integrated Access and Backhaul (IAB) radio transmission and reception
New Work Item 16.11.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationHampel Georg
RTS/TSGR-0438174vh80 (TS 138 174)
NR; Integrated Access and Backhaul (IAB) radio transmission and reception
New Work Item 17.8.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationHampel Georg
RTS/TSGR-0438174vi50 (TS 138 174)
NR; Integrated Access and Backhaul (IAB) radio transmission and reception
New Work Item 18.5.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationHampel Georg
RTS/TSGR-0438175vi10 (TS 138 175)
NR; Integrated Access and Backhaul (IAB) Electromagnetic Compatibility (EMC)
New Work Item 18.1.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationZhou Wubin
RTS/TSGR-0438176-1vg90 (TS 138 176-1)
NR; Integrated Access and Backhaul (IAB) conformance testing; Part 1: Conducted conformance testing
New Work Item 16.9.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0438176-1vh90 (TS 138 176-1)
NR; Integrated Access and Backhaul (IAB) conformance testing; Part 1: Conducted conformance testing
New Work Item 17.9.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0438176-1vi50 (TS 138 176-1)
NR; Integrated Access and Backhaul (IAB) conformance testing; Part 1: Conducted conformance testing
New Work Item 18.5.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0438176-2vga0 (TS 138 176-2)
NR; Integrated Access and Backhaul (IAB) conformance testing; Part 2: Radiated conformance testing
New Work Item 16.10.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationGolebiowski Bartlomiej
RTS/TSGR-0438176-2vh90 (TS 138 176-2)
NR; Integrated Access and Backhaul (IAB) conformance testing; Part 2: Radiated conformance testing
New Work Item 17.9.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationGolebiowski Bartlomiej
RTS/TSGR-0438176-2vi50 (TS 138 176-2)
NR; Integrated Access and Backhaul (IAB) conformance testing; Part 2: Radiated conformance testing
New Work Item 18.5.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationGolebiowski Bartlomiej
RTS/TSGR-0438181vh50 (TS 138 181)
NR; Satellite Access Node conformance testing
New Work Item 17.5.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationGuo Qiuge
RTS/TSGR-0438181vi20 (TS 138 181)
NR; Satellite Access Node conformance testing
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationGuo Qiuge
RTS/TSGR-0438307vhd0 (TS 138 307)
NR; Requirements on User Equipments (UEs) supporting a release-independent frequency band
New Work Item 17.13.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVasenkari Petri
RTS/TSGR-0438307vi20 (TS 138 307)
NR; Requirements on User Equipments (UEs) supporting a release-independent frequency band
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVasenkari Petri
RTR/TSGR-0438718-1vi00 (TR 138 718-1)
Rel-18 NR intra band Carrier Aggregation for xCC DL/yCC UL including contiguous and non-contiguous s
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationLindell Per
RTR/TSGR-0438718-2vi00 (TR 138 718-2)
NR inter-band Carrier Aggregation/Dual connectivity for 2 bands DL with x bands UL (x=1,2)
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationZhou Wubin
RTR/TSGR-0438718-3vi00 (TR 138 718-3)
NR inter-band Carrier Aggregation/Dual Connectivity for 3 bands DL with x bands UL(x=1,2)
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationMa Zhifeng
RTR/TSGR-0438751vi20 (TR 138 751)
UE RF requirement for NR frequency range 2 (FR2) multi-Rx chain DL reception
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationDu Hao
RTR/TSGR-0438761vi20 (TR 138 761)
Measurements of Multiple Input Multiple Output (MIMO) Over-the-Air (OTA) performance of User Equipme
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationZhu Siting
RTR/TSGR-0438786vi20 (TR 138 786)
User Equipment (UE) radio transmission and reception for NR sidelink evolution
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationXing Jinqiang
RTR/TSGR-0438803ve40 (TR 138 803)
Study on new radio access technology: Radio Frequency (RF) and co-existence aspects
New Work Item 14.4.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationUmeda Hiromasa
RTR/TSGR-0438846vi10 (TR 138 846)
Study on simplification of band combination specification
New Work Item 18.1.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationMa Zhifeng
RTR/TSGR-0438849vi40 (TR 138 849)
Introduction of 6GHz NR unlicensed operation
New Work Item 18.4.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationHejselbaek Johannes
RTR/TSGR-0438850vi00 (TR 138 850)
Rel-18 High power UE (power class 2) for FR1 NR FDD band in UL of NR inter-band CA/DC combinations w
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationBASAIER JIALADE
RTR/TSGR-0438863vi20 (TR 138 863)
Non-terrestrial networks (NTN) related RF and co-existence aspects
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationJin Yiran
RTR/TSGR-0438870vi20 (TR 138 870)
Enhanced Over-the-Air (OTA) test methods for NR FR1 Total Radiated Power (TRP) and Total Radiated Se
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationWang Ruixin
RTR/TSGR-0438876vi20 (TR 138 876)
Air-to-ground network for NR
New Work Item 18.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationGuo Chunxia
RTR/TSGR-0438878vi30 (TR 138 878)
NR demodulation performance evolution
New Work Item 18.3.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationWu Jingzhou
Other WI reports Previous Next Full Search