searching Work items...
Work item number  VersionCurrent statusNext statusRapporteur name
RTS/TSGR-0437105vgg0 (TS 137 105)
Active Antenna System (AAS) Base Station (BS) transmission and reception
New Work Item 16.16.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0437105vha0 (TS 137 105)
Active Antenna System (AAS) Base Station (BS) transmission and reception
New Work Item 17.10.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0437105vi50 (TS 137 105)
Active Antenna System (AAS) Base Station (BS) transmission and reception
New Work Item 18.5.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0437141vhe0 (TS 137 141)
NR, E-UTRA, UTRA and GSM/EDGE; Multi-Standard Radio (MSR) Base Station (BS) conformance testing
New Work Item 17.14.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationSkold Johan
RTS/TSGR-0437141vi60 (TS 137 141)
NR, E-UTRA, UTRA and GSM/EDGE; Multi-Standard Radio (MSR) Base Station (BS) conformance testing
New Work Item 18.6.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationSkold Johan
RTS/TSGR-0437145-2vfi0 (TS 137 145-2)
Active Antenna System (AAS) Base Station (BS) conformance testing; Part 2: radiated conformance tes
New Work Item 15.18.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0437145-2vgi0 (TS 137 145-2)
Active Antenna System (AAS) Base Station (BS) conformance testing; Part 2: radiated conformance tes
New Work Item 16.18.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0437145-2vhc0 (TS 137 145-2)
Active Antenna System (AAS) Base Station (BS) conformance testing; Part 2: radiated conformance tes
New Work Item 17.12.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTS/TSGR-0437145-2vi60 (TS 137 145-2)
Active Antenna System (AAS) Base Station (BS) conformance testing; Part 2: radiated conformance tes
New Work Item 18.6.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationKybett Richard
RTR/TSGR-0437718-0vi00 (TR 137 718-0)
Rel-18 SUL Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sh
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationZhang Peng
RTR/TSGR-0437718-11vi00 (TR 137 718-11)
Rel-18 DC of x bands (x=1,2,3,4) LTE inter-band CA (xDL/1UL) and 2 bands NR inter-band CA (2DL/1UL)
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationLee Sang-wook
RTR/TSGR-0437718-21vi00 (TR 137 718-21)
Dual Connectivity of 2 bands LTE inter-band CA and 1 NR band
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationLiu Liehai
RTR/TSGR-0437828vh20 (TR 137 828)
High-power UE operation for fixed-wireless/vehicle-mounted use cases in LTE bands and NR bands
New Work Item 17.2.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVasenkari Petri
RTR/TSGR-0437829vi00 (TR 137 829)
High-power UE operation for fixed-wireless/vehicle-mounted use cases in LTE bands and NR bands for R
New Work Item 18.0.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVasenkari Petri
RTR/TSGR-0437941vh40 (TR 137 941)
Radio Frequency (RF) conformance testing background for radiated Base Station (BS) requirements
New Work Item 17.4.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationSzydelko Michal
RTR/TSGR-0437941vi10 (TR 137 941)
Radio Frequency (RF) conformance testing background for radiated Base Station (BS) requirements
New Work Item 18.1.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationSzydelko Michal
RTS/TSGR-0438101-1vfq0 (TS 138 101-1)
NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone
New Work Item 15.26.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-1vgk0 (TS 138 101-1)
NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone
New Work Item 16.20.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-1vhe0 (TS 138 101-1)
NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone
New Work Item 17.14.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-1vi60 (TS 138 101-1)
NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone
New Work Item 18.6.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-2vfq0 (TS 138 101-2)
NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone
New Work Item 15.26.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-2vgk0 (TS 138 101-2)
NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone
New Work Item 16.20.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-2vhe0 (TS 138 101-2)
NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone
New Work Item 17.14.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-2vi60 (TS 138 101-2)
NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone
New Work Item 18.6.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-3vfq0 (TS 138 101-3)
NR; User Equipment (UE) radio transmission and reception; Part 3: Range 1 and Range 2 Interworking o
New Work Item 15.26.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-3vgk0 (TS 138 101-3)
NR; User Equipment (UE) radio transmission and reception; Part 3: Range 1 and Range 2 Interworking o
New Work Item 16.20.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-3vhe0 (TS 138 101-3)
NR; User Equipment (UE) radio transmission and reception; Part 3: Range 1 and Range 2 Interworking o
New Work Item 17.14.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-3vi60 (TS 138 101-3)
NR; User Equipment (UE) radio transmission and reception; Part 3: Range 1 and Range 2 Interworking o
New Work Item 18.6.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationVintola Ville
RTS/TSGR-0438101-4vfm0 (TS 138 101-4)
NR; User Equipment (UE) radio transmission and reception; Part 4: Performance requirements
New Work Item 15.22.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationQiu Haijie
RTS/TSGR-0438101-4vgh0 (TS 138 101-4)
NR; User Equipment (UE) radio transmission and reception; Part 4: Performance requirements
New Work Item 16.17.0Status has changed within the last 45 days Draft receipt by ETSI Secretariat (2024-06-20)PublicationQiu Haijie
Other WI reports Previous Next Full Search