searching documents...


 
 Doc nameTitleSourceDescription
 INT(10)0001INT#8 Meeting detailsETSI SecretariatOther Contribution
 INT(10)0002INT#8 Meeting AgendaTB ChairmanMeeting Agenda
 INT(10)0002r1INT#8 Meeting AgendaTB ChairmanMeeting Agenda
 INT(10)0002r2INT#8 Meeting AgendaTB ChairmanMeeting Agenda
 INT(10)0003INT#8 Draft Meeting ReportTB ChairmanMeeting Report
 INT(10)0004Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 1: PICSMartin BrandNew Draft
 INT(10)0004r1Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 1: PICSMartin BrandNew Draft
 INT(10)0004r2Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 1: PICSTelekom AustriaNew Draft
 INT(10)0004r3Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 1: PICSTelekom AustriaNew Draft
 INT(10)0005Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 2: Test Suite Structure and Test Purposes (TSS&TP)Telekom AustriaNew Draft
 INT(10)0005r1Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 2: Test Suite Structure and Test Purposes (TSS&TP)Telekom AustriaNew Draft
 INT(10)0005r2Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 2: Test Suite Structure and Test Purposes (TSS&TP)Telekom AustriaNew Draft
 INT(10)0005r3Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks Part 2: Test Suite Structure and Test Purposes (TSS&TP)Telekom AustriaNew Draft
 INT(10)0006Signalling System Testing for Future Telecom IP Networks:The ETSI ApproachTB ChairmanOther Contribution
 INT(10)0007IMS Plugtests#4: Request of Priorities to the technical scopeTB ChairmanOther Contribution
 INT(10)000800023-1 Message Waiting Indication test specification PICSRapporteurNew Draft
 INT(10)0008r100023-1 Message Waiting Indication test specification PICSRapporteurNew Draft
 INT(10)0008r200023-1 Message Waiting Indication test specification PICSRapporteurNew Draft
 INT(10)000900023-2 Message Waiting Indication test specification TSS&TPRapporteurNew Draft
 INT(10)0009r100023-2 Message Waiting Indication test specification TSS&TPRapporteurNew Draft
 INT(10)0009r200023-2 Message Waiting Indication test specification TSS&TPRapporteurNew Draft
 INT(10)0010INT workprogrammeETSI SecretariatOther Contribution
 INT(10)0011Test specs for NNI Interop- Scope and input for STFRapporteurOther Contribution
 INT(10)0012LS from RCSRCSLiaison Statement IN
 INT(10)0013Presentation from HOTARU-beta5HOTARU-beta5Other Contribution
 INT(10)0013r1Presentation from HOTARU-beta5HOTARU-beta5Other Contribution
 INT(10)0014Draft Tor Implementation of Extended IMS NNI TDsTB Chairman 
 INT(10)0015Why Interoperability TestTB ChairmanOther Contribution
 INT(10)0016OCG_40 SummaryETSI SecretariatOther Contribution
 INT(10)0017IMS Interoperability Event #4TB ChairmanOther Contribution
Previous Next Other INT documents (docbox)