2024-04-19 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RTS/INT-00168-3' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RTS/INT-00168-3 (PDF Format) Download standrd ref:
RTS/INT-00168-3 (Word Format) Download standrd ref:
RTS/INT-00168-3 (Zip Format)
  RTS/INT-00168-3 TS 103 653-3 T006 INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-01-18) 2.1.1 2022-01-18 View Standstill Information 2020-06-11
  Rapporteur Technical Officer Harmonised Standard
  Bostjan Pintar Emmanuelle Chaulot-Talmon No
 
Title Core Network and Interoperability Testing (INT); VoLTE/ViLTE interoperability test description over 4G/early 5G in physical/virtual environments; (3GPP™ Release 15); Part 3: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) for VoLTE/ViLTE interoperability
ATS&PIXIT for VoLTE/ViLTE interoperability 
Scope and Field
of Application
VoLTE/ViLTE interoperability test descriptions cover the test scenarios within single-network configuration over 4G/early 5G in physical/virtual environments, as well as interconnect and roaming test scenarios within multiple-network configurations. Test descriptions provide monitoring points and test specifications in prose details with focus on different interworking and interoperability interfaces using SIP, Diameter protocols and checks of ENUM Transactions.  
Supporting
Organizations
TELECOM ITALIA S.p.A., Deutsche Telekom AG, Fraunhofer FOKUS, Mesaqin.com s.r.o (Ltd.) 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ATS
INTEROPERABILITY
PIXIT
ViLTE
VoLTE
  Interoperability
     
Official Journal
     
Remarks
2021-12-06 mouqueta Final draft for approval proposal in contribution INT(21)000028 was Accepted by INT
2021-11-16 schmitting Draft contributed - V 2.0.2 contributed for Decision in INT(21)000028 as Final draft for approval
2021-11-16 schmitting A new draft is uploaded - V 2.0.2 with status: Final draft for approval
2021-06-28 schmitting Draft contributed - V 2.0.1 contributed for Discussion in INT(21)049005 as Stable draft
2021-03-08 schmitting Draft contributed - V 2.0.1 contributed for Discussion in INT(21)048005 as Stable draft
2021-03-05 schmitting A new draft is uploaded - V 2.0.1 with status: Stable draft
2020-06-11 CHAULOTT TB adoption of WI INT, see contribution INT(20)000012
2020-06-11 CHAULOTT WI proposed to TB INT, see contribution INT(20)000012
 

ETSI Home Page Any comments or problems with this application? Please let us know...