2024-04-19 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTS/EE-0259-3' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTS/EE-0259-3 (PDF Format) Download standrd ref:
DTS/EE-0259-3 (Word Format)
  DTS/EE-0259-3 TS 103 553-3   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2020-01-23) 1.1.1 2020-01-23 View Standstill Information 2016-01-21
  Rapporteur Technical Officer Harmonised Standard
  Claudio Bianco Marcello Pagnozzi No
 
Title Environmental Engineering (EE); Innovative energy storage technology for stationary use; Part 3: Supercapacitor
Innovative energy storage technology - supercapacitor (TA-ITU:L.1222) 
Scope and Field
of Application
This series introduces evolution of Energy Storage applicable for use with stationary ICT/Telecom equipment and global results of investigations in laboratories or from field tests in Telecom/ICT network or customer premises e.g. for resilience in smart sustainable city. Mobile and portable batteries are out of the scope.

The scope of this document includes: - identification of available Supercapacitor technology or roadmap - Characteristics (electrical , mechanical, thermal, …) - Test lab results and/or field experiment results - Recommendations of adapted use of each technology - Recommendation for appropriate minimum benchmark tests and deeper characterization

These WIs are also present in ITU-T SG5/WP3 for a joint activity; ITU-T WI (L.ENST 1,2,3) 
Supporting
Organizations
ORANGE, TELECOM ITALIA S.p.A., BT Group Plc, BNetzA, Ericsson AB, CATR, Huawei Technologies Sweden AB 

 

Keywords Projects Clusters Frequencies Mandates Directives
  battery
POWER SUPPLY
  Better Living with ICT
     
Official Journal
     
Remarks
2019-11-07 pagnozzi Final draft for approval proposal in contribution EE(19)056035r2 was Accepted by EE
2019-11-07 pagnozzi Draft contributed - V 0.0.8 contributed for Decision in EE(19)056035r2 as Final draft for approval
2019-11-07 pagnozzi Final draft for approval proposal in contribution EE(19)056035r1 was Revised by EE
2019-11-07 pagnozzi A new draft is uploaded - V 0.0.8 with status: Final draft for approval
2019-11-07 pagnozzi Draft contributed - V 0.0.7 contributed for Decision in EE(19)056035r1 as Final draft for approval
2019-11-07 pagnozzi A new draft is uploaded - V 0.0.7 with status: Final draft for approval
2019-11-07 pagnozzi WG approval proposal in contribution EE(19)056035 was Revised by EE
2019-11-07 pagnozzi Draft contributed - V 0.0.6 contributed for Decision in EE(19)056035 as WG approval
2019-11-06 pagnozzi Draft contributed - V 0.0.6 contributed for Decision in EE(19)056025 as WG approval
2019-11-06 pagnozzi Final draft for approval proposal in contribution EE2(19)056006r1 was Accepted by EE 02
2019-11-06 bianco Draft contributed - V 0.0.6 contributed for Decision in EE2(19)056006r1 as Final draft for approval
2019-11-06 bianco Final draft for approval proposal in contribution EE2(19)056006 was Revised by EE 02
2019-11-05 bianco Draft contributed - V 0.0.6 contributed for Decision in EE2(19)056006 as Final draft for approval
2019-11-05 bianco A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2018-03-27 marquet A new draft is uploaded - V 0.0.4 with status: Stable draft - with comment: Version consented in ITU-T to be converted in ETSI format by EE2 Editor
2017-11-22 bianco Draft contributed - V 0.0.3 contributed for Discussion in EE2(17)052013 as Early draft
2017-11-22 bianco A new draft is uploaded - V 0.0.3 with status: Early draft
2017-06-17 marquet Draft contributed - V 0.0.2 contributed for Information in EE2(17)051028 as Early draft
2017-06-17 marquet A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: TIM Editor (Claudio) revision of early draft
2016-10-06 marquet A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: same is presented at ITU-T Q19_5 in Geneva 10-14oct
2016-02-22 PAGNOZZI TB adoption of WI EE, see contribution EE(16)000004 in RC EE(16)DEC083
2016-02-05 PAGNOZZI WI proposed to TB EE, see contribution EE(16)000004
2016-02-05 PAGNOZZI WI accepted by WG EE 02, see contribution EE2(16)000003 in RC EE2(16)DEC021
2016-01-21 PAGNOZZI WI proposed to WG EE 02, see contribution EE2(16)000003
 

Specific aspects
  Environmental aspects

ETSI Home Page Any comments or problems with this application? Please let us know...