Specialist Task Force 277: Validation of Conformance Test
Specifications for the Interoperability of HIPERACCESS systems
Team Leader: Milan Zoric
Team Members:
Scott Moseley
Sebastian Mueller
Jean-Claude Wattelet
What
we do:
The STF
will produce the following deliverables for TB approval:
| RTS/BRAN-003T002-1R2 |
HIPERACCES; Conformance Testing for the Data Link Control Layer (DLC) Part 1: Protocol Conformance Implementation Statement (PICS) pro forma |
| RTS/BRAN-003T002-2R2 |
HIPERACCESS; Conformance Testing for the Data Link Control Layer (DLC) Part 2: Test Suite Structure and Test Purposes (TSS & TP) |
| RTS/BRAN-003T002-3R2 |
HIPERACCESS; Conformance Testing for the Data Link Control Layer (DLC) Part 3: Abstract Test Suite (ATS) |
The STF may identify the need to update the following deliverables. These
deliverables deal with Hiperaccess converngence layers where the size of the
specifications and the size of the related existing test specifications is minor
in comparison with the DLC part. If the base standards for convergence layers
change or the validation shows that changes are necessary, the documents will be
developed and submitted to BRAN for approval.
| RTS/BRAN-0034T03-1-1R2 |
HIPERACCESS; Conformance Testing for the cell based convergence layer; Part 1: Common part; Sub-part 1: Procotol Conformance Implementation Statement (PICS) proforma |
| RTS/BRAN-0034T03-1-2R2 |
HIPERACCESS; Conformance Testing for the cell based convergence layer; Part 1: Common part; Sub-part 2: Test Suite Structure and Test Purposes (TSS & TP) specification |
| RTS/BRAN-0034T03-1-3R2 |
HIPERACCESS; Conformance Testing for the cell based convergence layer; Part 1: Common part; Sub-part 3: Abstract Test Suite (ATS) |
| RTS/BRAN-0034T03-2-1R2 |
HIPERACCESS; Conformance Testing for the cell based convergence layer; Part 2: UNI service specific convergence sublayer (SSCS); Sub-art 1: Procotol Conformance Implementation Statement (PICS) proforma |
| RTS/BRAN-0034T03-2-2R2 |
HIPERACCESS; Conformance Testing for the cell based convergence layer; Part 2: UNI service specific convergence sublayer (SSCS); Sub-part 2: Test Suite Structure and Test Purposes (TSS & TP) |
| RTS/BRAN-0034T03-2-3R2 |
HIPERACCESS; Conformance Testing for the cell based convergence layer; Part 2: UNI service specific convergence sublayer (SSCS); Sub-part 3: Abstract Test Suite (ATS) |
| RTS/BRAN-0034T04-1-1R2 |
HIPERACCESS; Conformance Testing for the Packet Based Convergence Layer; Part 1: Common part; Sub-part 1: Procotol Conformance Implementation Statement (PICS) proforma |
| RTS/BRAN-0034T04-1-2R2 |
HIPERACCESS; Conformance Testing for the Packet Based Convergence Layer; Part 1: Common part; Sub-part 2: Test Suite Structure and Test Purposes (TSS & TP) |
| RTS/BRAN-0034T04-1-3R2 |
HIPERACCESS; Conformance Testing for the Packet Based Convergence Layer; Part 1: Common part; Sub-part 3: Abstract Test Suite (ATS) |
| RTS/BRAN-0034T04-2-1R2 |
HIPERACCESS; Conformance Testing for the Packet Based Convergence Layer; Part 2: Ethernet Service Specific Convergence Sublayer (SSCS); Sub-part 1: Procotol Conformance Implementation Statement (PICS) proforma |
| RTS/BRAN-0034T04-2-2R2 |
HIPERACCESS; Conformance Testing for the Packet Based Convergence Layer; Part 2: Ethernet Service Specific Convergence Sublayer (SSCS); Sub-part 2: Test Suite Structure and Test Purposes (TSS & TP) |
| RTS/BRAN-0034T04-2-3R2 |
HIPERACCESS; Conformance Testing for the Packet Based Convergence Layer; Part 2: Ethernet Service Specific Convergence Sublayer (SSCS); Sub-part 3: Abstract Test Suite (ATS) |
Read our
Terms
of Reference
You can have access to the
draft
deliverables.
Why we do it:
The STF is required to complete the validation of the HIPERACCESS test
specifications.
The first versions of Conformance test specifications for HIPERACCESS system
were published in October 2002. During 2003 the work is continuing with
alignment of test specifications with the changes in the base standards approved
by BRAN. Important part of ongoing work is the specification and implementation
of a virtual tester with UDP/IP based adaptation layer that will assure the
capability to validate the test specifications independent of the availability
of radio based test tool. The two projects that worked on HIPERACCESS
Conformance test specifications were funded under eEurope.
Time plan for the work:
This STF will be active from
October 2004 to May 2005.
How to contact us:
If you would like more information, please contact the STF Leader: mailto:milan.zoric@etsi.org
Note: this information is based upon STF working assumptions.
The views expressed do not necessarily represent the position of ETSI in this
context.
Last updated: 2010-02-18 10:21:45